Hydro Plant Levels & Flows
This information is updated every hour for river users near AEP's hydroelectric facilities. See plant locations.
Explanation of terms: The 'Forebay' and 'Tailwater' numbers show the elevation, in feet above sea level, of the water levels just upstream and downstream of the plants. 'Tailwater Flow' is the hourly average of the river flow just downstream of the plants, measured in cubic feet per second.
Updated 25-MAY-2013 20:05 EDT
Roanoke River
|
Project |
Normal Full Pond |
Forebay Actual (Feet) |
Tail Water (Feet) |
|
Niagara |
885.00
|
885.11 |
|
|
Smith Mountain |
795.00
|
794.41 |
605.89 |
|
Leesville |
613.00
|
606.11 |
534.80 |
Smith Mountain Adjusted Elevation: 795.20
This is the level the lake would be if the water currently held in the lower Leesville Lake for reuse were pumped back into Smith Mountain Lake.
See the Additional Information section below for plant-specific notices.
New River
|
Project |
Normal Full Pond |
Forebay Actual (Feet) |
Tail Water (Feet) |
Tail Water Flow (CFS) |
|
Buck |
2003.40
|
1996.61 |
1961.54 |
6526 |
|
Byllesby |
2079.20
|
2073.31 |
2023.95 |
6154 |
|
Claytor |
1846.00
|
1845.36 |
1731.17 |
5165 |
See the Additional Information section below for plant-specific notices.
Kanawha River
|
Project |
Normal Full Pond |
Forebay Actual (Feet) |
Tail Water (Feet) |
Tail Water Flow (CFS) |
|
London |
614.00
|
614.14 |
592.35 |
6335 |
|
Marmet |
590.00
|
590.49 |
568.93 |
9598 |
|
Winfield |
566.00
|
566.27 |
539.89 |
7968 |
See the Additional Information section below for plant-specific notices.
James River
|
Project |
Normal Full Pond |
Forebay Actual (Feet) |
Tail Water (Feet) |
Tail Water Flow (CFS) |
|
Reusens |
550.70
|
550.90 |
518.93 |
7864 |
See the Additional Information section below for plant-specific notices.
Ohio River
|
Project |
Normal Full Pond |
Forebay Actual (Feet) |
Tail Water (Feet) |
Tail Water Flow (CFS) |
|
Racine |
560.00
|
560.77 |
538.68 |
16089 |
See the Additional Information section below for plant-specific notices.
Saint Joseph River
|
Project |
Normal Full Pond |
Forebay Actual (Feet) |
Tail Water (Feet) |
Tail Water Flow (CFS) |
|
Constantine |
782.90
|
782.87 |
771.50 |
|
|
Mottville |
summer: 770.40
winter: 770.00
|
770.37 |
759.61 |
1944 |
|
Elkhart |
summer: 741.50
winter: 739.50
|
741.63 |
722.37 |
|
|
Twin Branch |
717.10
|
717.13 |
696.12 |
2834 |
|
Buchanan |
summer: 637.50
winter: 637.00
|
637.47 |
624.30 |
5388 |
|
Berrien Springs |
623.50
|
623.47 |
598.68 |
4314 |
See the Additional Information section below for plant-specific notices.
Additional Information
ALL HYDRO PROJECTS MAY HAVE FLOW MODIFICATIONS CAUSED BY WEATHER CONDITIONS OR OTHER DEMANDS. CHANGES MAY BE MADE WITHOUT NOTICE.
FOR CURRENT RESERVOIR LEVELS, CALL 540-985-2767 OR CONSULT THE WEBSITE AT AEP.COM.
APPALACHIAN POWER OPERATES CLAYTOR HYDRO IN LEVELIZED "RUN OF RIVER" RELEASE FROM APRIL 1ST TO NOVEMBER 30TH AND IN PEAKING MODE FROM DECEMBER 1ST TO MARCH 31ST. FOR SATURDAY 25, 2013, WE ARE CURRENTLY GENERATING WITH THREE UNITS WITH A TOTAL AVERAGE DISCHARGE OF 6463 CFS.
AS OF 05:00 THIS MORNING SATURDAY MAY 25, 2013, INFLOW TO THE SMITH MOUNTAIN PROJECT WAS 2840 AND THE DISCHARGE FROM LEESVILLE 3307 .THE ADJUSTED RESERVOIR ELEVATION WAS 795.34'. THE FLOW RATE AT THE USGS GAUGE AT BROOKNEAL WAS 4690 CFS, STAGE 8.09' AND AT ALTAVISTA 4060 CFS, STAGE 6.41'.