Hydro Plant Levels & Flows

This information is updated every hour for river users near AEP's hydroelectric facilities. See plant locations.

Explanation of terms: The 'Forebay' and 'Tailwater' numbers show the elevation, in feet above sea level, of the water levels just upstream and downstream of the plants. 'Tailwater Flow' is the hourly average of the river flow just downstream of the plants, measured in cubic feet per second.

Updated 15-DEC-2017 05:20 EDT

Roanoke River

Project Normal Full Pond Forebay Actual (Feet) Tail Water (Feet)
Niagara 885.00 885.39
Smith Mountain 795.00 792.37 604.58
Leesville 613.00 605.33 532.75

Smith Mountain Adjusted Elevation: 793.07
This is the level the lake would be if the water currently held in the lower Leesville Lake for reuse were pumped back into Smith Mountain Lake.

See the Additional Information section below for plant-specific notices.

New River

Project Normal Full Pond Forebay Actual (Feet) Tail Water (Feet) Tail Water Flow (CFS)
Buck 2003.40 2002.73 1960.63 1042
Byllesby 2079.20 2078.76 2023.63 1110
Claytor 1846.00 1844.51 1729.37 1017

Our New River Flows & Forecasts pages show information about releases from AEP's Claytor dam and forecasted water conditions downstream.

See the Additional Information section below for plant-specific notices.

Kanawha River

Project Normal Full Pond Forebay Actual (Feet) Tail Water (Feet) Tail Water Flow (CFS)
London 614.00 614.10 590.76 2606
Marmet 590.00 590.18 566.17 3083
Winfield 566.00 566.23 539.33 3937

See the Additional Information section below for plant-specific notices.

Ohio River

Project Normal Full Pond Forebay Actual (Feet) Tail Water (Feet) Tail Water Flow (CFS)
Racine 560.00 561.43 539.14 0

See the Additional Information section below for plant-specific notices.

Saint Joseph River

Project Normal Full Pond Forebay Actual (Feet) Tail Water (Feet) Tail Water Flow (CFS)
Constantine 782.90 782.86 771.40
Mottville summer: 770.40
winter: 770.00
770.39 759.36 1600
Elkhart summer: 741.50
winter: 739.50
741.57 721.89
Twin Branch 717.10 716.99 695.42 2874
Buchanan summer: 637.50
winter: 637.00
637.50 623.94 3050
Berrien Springs 623.50 623.50 598.71 4411

See the Additional Information section below for plant-specific notices.

Additional Information

AS OF 05:00 THIS MORNING FRIDAY DECEMBER 15, 2017, INFLOW TO THE SMITH MOUNTAIN PROJECT WAS 425 CFS AND THE DISCHARGE FROM LEESVILLE 671 CFS. THE ADJUSTED RESERVOIR ELEVATION WAS 793.04'. THE FLOW RATE AT THE USGS GAUGE AT BROOKNEAL WAS 806 CFS, STAGE 4.46' AND AT ALTAVISTA 720 CFS, STAGE 3.43'.