FOR CURRENT RESERVOIR LEVELS, CALL 540-985-2767 OR CONSULT THE WEBSITE AT AEP.COM. ALL FLOW MODIFICATIONS ARE CONTINGENT UPON RESTRICTIONS AND REQUIREMENTS THAT MAY BE CAUSED BY EXTREME WEATHER OR OTHER DEMANDS. CHANGES MAY BE MADE WITHOUT NOTICE APPALACHIAN POWER WILL BEGIN ITS LEVELIZED "RUN OF RIVER" RELEASE OF WATER FROM CLAYTOR LAKE THURSDAY APRIL 15, 2010 TO ACCOMODATE RECREATIONAL NEEDS AND ACTIVITIES DOWNSTREAM FROM THE DAM. THE RECREATIONAL PERIOD ENDS OCTOBER 15, 2010. THE LONDON TAILRACE FISHING ACCESS HAS BEEN TEMPORARILY CLOSED DUE TO THE ABSENCE OF A DESIGNATED PUBLIC ACCESS FROM RT. 61. APPALACHIAN IS IN THE PROCESS OF OBTAINING PUBLIC ACCESS TO THE SITE. PLEASE NOTE:IN THE EVENT OF PRECIPITATION OR SYSTEM EMERGENCY, THE RELEASES FROM ANY HYDRO FACILITY COULD CHANGE WITHOUT NOTIFICATION. AS OF 05:00 THIS MORNING (9/1/10), INFLOW TO THE SMITH MOUNTAIN PROJECT WAS 424 CFS AND DISCHARGE FROM LEESVILLE 687.4 CFS . THE ADJUSTED RESERVOIR ELEVATION WAS 794.05 FT. THE FLOW AT THE USGS GAUGE AT BROOKNEAL WAS 976 CFS (6.62') AND AT ALTAVISTA 863 CFS (3.45') |