FOR CURRENT RESERVOIR LEVELS, CALL 540-985-2767 OR CONSULT THE WEBSITE AT AEP.COM. ALL FLOW MODIFICATIONS ARE CONTINGENT UPON RESTRICTIONS AND REQUIREMENTS THAT MAY BE CAUSED BY EXTREME WEATHER OR OTHER DEMANDS. CHANGES MAY BE MADE WITHOUT NOTICE DUE TO BELOW NORMAL INFLOWS AND DROPPING LAKE LEVELS AT SMITH MT PROJECT DEQ HAS AUTHORIZED THE FOLLOWING: DUE TO CONTINUED LOWER INFLOWS, APPALACHAIN HAS MODIFIED ITS RELEASES TO PROVIDE A DISCHARGE OF APPROXIMATELY 350 CFS FROM LEESVILLE DAM. THE REVISED FLOW IS A VARIANCE OF THE MINIMUM FLOW OF 650 CFS AS ESTABLISHED BY THE FERC LICENSE. RELEASES MAY BE REVISITED IF THE AREA EXPERIENCES A SIGNIFICANT RAINFALL EVENT OR IF OTHER CONDITIONS AFFECT LEVELS OR GENERATION OPERATIONS. CLAYTOR PLANT WILL BEGIN PEAKING OPERATION THURSDAY OCTOBER 16, 2008. PLANT PEAKING WILL BE A PART OF NORMAL OPERATION UNTIL APRIL 15, 2009 WHEN LEVELIZED FLOW OPERATION WILL BEGIN FOR RECREATIONAL FLOW ENHANCEMENTS, THE CLAYTOR LAKE DRAWDOWN WILL START MONDAY, NOVEMBER 3, 2008. THE LAKE WILL BE LOWERED NO MORE THAN ONE FOOT PER DAY UNTIL THE ELEVATION IS DOWN FIVE (5) FEET BY MONDAY MORNING, NOVEMBER 10, 2008. THE LAKE ELEVATION WILL NOT BE LOWERED MORE THAN 2 FEET BY THURSDAY EVENING, NOV. 6. THE LAKE WILL BE DOWN FIVE FEET UNTIL SATURDAY EVENING, NOVEMBER 22, WHEN, AT THAT TIME, THE LAKE WILL BE ALLOWED TO REFILL. PLEASE NOTE:IN THE EVENT OF PRECIPITATION OR SYSTEM EMERGENCY, THE RELEASES FROM ANY HYDRO FACILITY COULD CHANGE WITHOUT NOTIFICATION. AS OF 06:00 THIS MORNING (11/20/2008), INFLOW TO THE SMITH MOUNTAIN PROJECT WAS 434CFS AND DISCHARGE FROM LEESVILLE 381 CFS. THE ADJUSTED RESERVOIR ELEVATION WAS 791.33 FT. THE FLOW AT THE USGS GAUGE AT BROOKNEAL WAS 687 CFS (6.23 FT.) AND AT ALTAVISTA 626 CFS (2.97FT.) |