American Electric Power proposes to build a new 765-kilovolt (kV) transmission line
stretching from West Virginia to New Jersey. The proposed transmission superhighway
will span approximately 550 miles and is designed to reduce PJM congestion costs
by substantially improving west-east transfer capability by approximately 5,000
megawatts (MW) and reducing transmission line losses by approximately 280 MW.