In 2024, the U.S. Environmental Protection Agency (EPA) finalized the Legacy Coal Combustion Residuals (CCR) Rule that applies to surface impoundments (ponds) containing ash at inactive power plant sites. The rule also applies to certain previously closed ash storage locations and beneficial use projects that EPA classifies as CCR Management Units (CCRMU). The Legacy CCR Rule requires that applicable surface impoundments be identified by November 8, 2024. CCRMU locations are required to be identified by February 9, 2026.

For each location identified, a groundwater monitoring program will be established, along with written closure and post-closure care plans. Groundwater monitoring is expected to begin in 2025, and written closure plans will be developed in late 2027. The completion of closure work and the start of post-closure care monitoring are estimated to occur in the mid-2030s.

The former Glen Lyn Plant in Virginia was retired in 2015. The following legacy surface impoundments have been identified:

  • Bottom Ash Pond Complex

  • Auxiliary Ash Pond Complex

For details, please see the detailed documentation for the unit.

Unit
Title
File
Date
Auxiliary Ash Pond Complex
Fugitive Dust Plan
6/30/2026
Bottom Ash Pond Complex
Fugitive Dust Plan
6/30/2026
Auxiliary Ash Pond Complex
Emergency Action Plan
5/8/2026
Auxiliary Ash Pond Complex
Hazard Potential Classification
5/8/2026
Auxiliary Ash Pond Complex
Inflow Design Flood System Control Plan
5/8/2026
Auxiliary Ash Pond Complex
Safety Factor Assessment
5/8/2026
Auxiliary Ash Pond Complex
Structural Stability Assessment
5/8/2026
Bottom Ash Pond Complex
Emergency Action Plan
5/8/2026
Bottom Ash Pond Complex
Hazard Potential Classification
5/8/2026
Bottom Ash Pond Complex
Inflow Design Flood System Control Plan
5/8/2026
Bottom Ash Pond Complex
Safety Factor Assessment
5/8/2026
Bottom Ash Pond Complex
Structural Stability Assessment
5/8/2026
Auxiliary Ash Pond Complex
Annual Engineer Inspection Report
2/10/2026
Bottom Ash Pond Complex
Annual Engineer Inspection Report
2/10/2026
Auxiliary Ash Pond Complex
History of Construction
2/9/2026
Bottom Ash Pond Complex
History of Construction
2/9/2026
Auxiliary Ash Pond Complex
Fugitive Dust Report
9/30/2025
Bottom Ash Pond Complex
Fugitive Dust Report
9/30/2025
Auxiliary Ash Pond Complex
Annual Engineer Inspection Report
2/10/2025
Bottom Ash Pond Complex
Annual Engineer Inspection Report
2/10/2025
Auxiliary Ash Pond Complex
Applicability Report
11/4/2024
Bottom Ash Pond Complex
Applicability Report
11/4/2024