In 2024, the U.S. Environmental Protection Agency (EPA) finalized the Legacy Coal Combustion Residuals (CCR) Rule that applies to surface impoundments (ponds) containing ash at inactive power plant sites. The rule also applies to certain previously closed ash storage locations and beneficial use projects that EPA classifies as CCR Management Units (CCRMU). The Legacy CCR Rule requires that applicable surface impoundments be identified by November 8, 2024. CCRMU locations are required to be identified by February 9, 2026.

For each location identified, a groundwater monitoring program will be established, along with written closure and post-closure care plans. Groundwater monitoring is expected to begin in 2025, and written closure plans will be developed in late 2027. The completion of closure work and the start of post-closure care monitoring are estimated to occur in the mid-2030s.

The former Kammer Plant in West Virginia was retired in 2015. The following legacy surface impoundments have been identified:

  • Ash Pond

  • Boiler Slag Pond

For details, please see the detailed documentation for the unit.

Unit
Title
File
Date
Ash Pond
Fugitive Dust Plan
7/28/2026
Boiler Slag Pond
Fugitive Dust Plan
7/28/2026
Ash Pond
Emergency Action Plan
5/8/2026
Ash Pond
Hazard Potential Classification
5/8/2026
Ash Pond
Inflow Design Flood System Control Plan
5/8/2026
Ash Pond
Safety Factor Assessment
5/8/2026
Ash Pond
Structural Stability Assessment
5/8/2026
Boiler Slag Pond
Inflow Design Flood System Control Plan
5/8/2026
Ash Pond
Annual Engineer Inspection Report
2/10/2026
Ash Pond
History of Construction
2/9/2026
Boiler Slag Pond
Applicability Report
2/5/2026
Ash Pond
Fugitive Dust Report
9/30/2025
Boiler Slag Pond
Fugitive Dust Report
9/30/2025
Ash Pond
Annual Engineer Inspection Report
2/10/2025
Ash Pond
Applicability Report
11/4/2024
Boiler Slag Pond
Closure - Notification of Intent to Certify Closure