Skip to main content

River Flows for Hydro Plants

You may track, on an hourly basis, water levels and flows of the recreational rivers and lakes near AEP's hydroelectric facilities. See a map of our plant locations.

Explanation of Terms

  • The "Forebay" and "Tailwater" numbers show the feet above sea level of the water levels immediately upstream and downstream from our plants.
  • "Tailwater Flow" is the hourly average of the river flow just downstream of the plants, measured in cubic feet per second.

New River Flows & Forecasts

Water release information for AEP's Claytor, Buck, and Byllesby hydro dams is updated every fifteen minutes. Forecast information is estimated. Water travel times may be affected by water conditions, precipitation in the watershed and other factors.

Most Recent Conditions

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Buck2003.402003.031960.171070
Byllesby2079.202078.892022.561005
Claytor1846.001845.591730.481357
See plant-specific notices below. Data last updated on Jun 20 2026, 12:38 AM EST. Tail water (cfs) is last hour average.

Downstream Forecasts

Forecast information shows water release information from the Claytor Dam, delayed to account for the average time it takes the released water to reach particular points downstream. Water travel times may be affected by water conditions, precipitation in the watershed and other factors.

Kanawha River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
London614.00614.18590.882603
Marmet590.00590.22566.172577
Winfield566.00566.18538.865040
See plant-specific notices below. Data last updated on Jun 20 2026, 12:38 AM EST. Tail water (cfs) is last hour average.

Roanoke River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Niagara885.00885.16
Smith Mountain795.00789.87602.28
Leesville613.00.00604.13532.08660
See plant-specific notices below. Data last updated on Jun 20 2026, 12:38 AM EST. Tail water (cfs) is last hour average.

Saint Joseph River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Constantine782.90782.87771.74
MottvilleSummer: 770.40
Winter: 770.00
770.40759.351933
Elkhart741.50
winter: 739.50
741.54723.63
Twin Branch717.10716.82696.633517
BuchananSummer: 637.50
Winter: 637.00
637.49625.013473
Berrien Springs623.50623.51598.884722
See plant-specific notices below. Data last updated on Jun 20 2026, 12:38 AM EST. Tail water (cfs) is last hour average.

Plant–Specific Notices

As of 05:00 this morning, Friday June 19, 2026, inflow to the Smith Mountain Project was 389 CFS and the discharge from Leesville was 656 CFS. The adjusted reservoir elevations was 790.4 ft. The flow rate at the USGS Gauge at Brookneal was 810 CFS, Stage 4.31 ft. and at Altavista 804 CFS, Stage 1.96 ft.