Skip to main content

River Flows for Hydro Plants

You may track, on an hourly basis, water levels and flows of the recreational rivers and lakes near AEP's hydroelectric facilities. See a map of our plant locations.

Explanation of Terms

  • The "Forebay" and "Tail Water" values shown are the water surface elevation of the lake or river (in feet) immediately upstream and downstream, respectively, of the dam. The elevation datum is National Geodetic Vertical Datum of 1929.
  • "Tail Water Flow (CFS)" is the hourly average of the river flow just downstream of the dams, measured in cubic feet per second.

New River Flows & Forecasts

Water release information for AEP's Claytor, Buck, and Byllesby hydro dams is updated every fifteen minutes. Forecast information is estimated. Water travel times may be affected by water conditions, precipitation in the watershed and other factors.

Most Recent Conditions

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Buck2003.402003.021961.342628
Byllesby2079.202078.832023.682520
Claytor1846.001845.641731.863656
See plant-specific notices below. Data last updated on Aug 5 2026, 8:54 AM EST. Tail water (cfs) is last hour average.

Downstream Forecasts

Forecast information shows water release information from the Claytor Dam, delayed to account for the average time it takes the released water to reach particular points downstream. Water travel times may be affected by water conditions, precipitation in the watershed and other factors.

Kanawha River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
London614.00614.37591.316182
Marmet590.00590.09566.977343
Winfield566.00566.15539.499494
See plant-specific notices below. Data last updated on Aug 5 2026, 8:54 AM EST. Tail water (cfs) is last hour average.

Roanoke River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Niagara885.00884.77827.57321.00
Smith Mountain795.00789.96601.33
Leesville613.00.00603.09531.90414
See plant-specific notices below. Data last updated on Aug 5 2026, 8:54 AM EST. Tail water (cfs) is last hour average.

Saint Joseph River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Constantine782.90782.71771.19
MottvilleSummer: 770.40
Winter: 770.00
770.38758.371010
Elkhart741.50
winter: 739.50
741.49723.22
Twin Branch717.10716.98696.281708
BuchananSummer: 637.50
Winter: 637.00
637.47624.391600
Berrien Springs623.50623.54598.522557
See plant-specific notices below. Data last updated on Aug 5 2026, 8:54 AM EST. Tail water (cfs) is last hour average.

Plant–Specific Notices

As of 05:00 this morning, Wednesday August 05, 2026, inflow to the Smith Mountain Project (which includes both Smith Mountain Lake and Leesville Lake) was 1055 CFS and the discharge from Leesville was 415 CFS. The adjusted reservoir elevations was 790.4 ft. The flow rate at the USGS Gauge at Brookneal was 570 CFS, Stage 3.95 ft. and at Altavista 513 CFS, Stage 1.70 ft..