River Flows for Hydro Plants

You may track, on an hourly basis, water levels and flows of the recreational rivers and lakes near AEP's hydroelectric facilities. See a map of our plant locations.

Explanation of Terms

  • The "Forebay" and "Tailwater" numbers show the feet above sea level of the water levels immediately upstream and downstream from our plants.
  • "Tailwater Flow" is the hourly average of the river flow just downstream of the plants, measured in cubic feet per second.

New River Flows & Forecasts

Water release information for AEP's Claytor, Buck, and Byllesby hydro dams is updated every fifteen minutes. Forecast information is estimated. Water travel times may be affected by water conditions, precipitation in the watershed and other factors.

Most Recent Conditions

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Buck2003.402002.841962.113418
Byllesby2079.202078.602020.872663
Claytor1846.001845.911732.764994
See plant-specific notices below. Data last updated on Aug 2 2025, 3:59 AM EST. Tail water (cfs) is last hour average.

Downstream Forecasts

Forecast information shows water release information from the Claytor Dam, delayed to account for the average time it takes the released water to reach particular points downstream. Water travel times may be affected by water conditions, precipitation in the watershed and other factors.

Kanawha River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
London614.00614.01590.875429
Marmet590.00590.05566.806204
Winfield566.00566.15539.038375
See plant-specific notices below. Data last updated on Aug 2 2025, 3:59 AM EST. Tail water (cfs) is last hour average.

Roanoke River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Niagara885.00885.57
Smith Mountain795.00794.62602.94
Leesville613.00.00604.23531.80708
See plant-specific notices below. Data last updated on Aug 2 2025, 3:59 AM EST. Tail water (cfs) is last hour average.

Saint Joseph River

ProjectNormal Full PondForebay Actual (Feet)Tail Water (Feet)Tail Water (CFS)
Constantine782.90782.82771.21
MottvilleSummer: 770.40
Winter: 770.00
770.40758.421037
Elkhart741.50
winter: 739.50
741.59721.77
Twin Branch717.10716.91696.292011
BuchananSummer: 637.50
Winter: 637.00
637.52624.411716
Berrien Springs623.50623.59598.402212
See plant-specific notices below. Data last updated on Aug 2 2025, 3:59 AM EST. Tail water (cfs) is last hour average.

Plant–Specific Notices

As of 05:00 this morning, Friday August 01, 2025, inflow to the Smith Mountain Project was 722 CFS and the discharge from Leesville was 707 CFS. The adjusted reservoir elevations was 794.9 ft. The flow rate at the USGS Gauge at Brookneal was 1120 CFS, Stage 4.75 ft. and at Altavista 812 CFS, Stage 2.18 ft.